Food Processing Line Installation  

 

Client

PepsiCo 

 

Scope of Work

Construction, assembly, and positioning of a food processing line assembly including conveyor systems, washing tanks, stainless steel operating platforms, and frames...

 

Timeline

2025

Actual Construction Images

Overview of the Sormac line system
Sormac blue plastic conveyor system Potato sorting roller conveyor
Technician assembling Tomra sorting machine

Execution Process

Using Boom Lift for high-altitude construction
Phase 01

Survey & Rigging Plan

Conducting site measurements. Developing a rigging plan using forklifts (Boom Lift, machine skates, hoists) to move, lift, and position oversized and overweight machinery modules accurately and safely, ensuring no floor scratches or collisions with existing systems.

Connecting the central control panel
Phase 02

Mechanical & Electrical Assembly

 Erecting stainless steel support frames, operating stairs, and safety railings.

 Assembling and connecting machinery units (Tomra sorters, conveyors) according to technical drawings.

 The engineering team conducts wiring for power and signal cables for the line's central control panel system.

Commissioning and test-run of the potato processing line
Phase 03

Commissioning & Handover

Adjusting the leveling of the entire system. Coordinating with experts to input raw materials (potatoes) for a real-world test-run. Performing industrial cleaning to microbiological standards before final handover for production.

PV-VINA's Commitment

Rigging Safety

Excellent risk management in the relocation and heavy lifting of equipment within tight workshop spaces, ensuring 100% safety for people and assets.

HSE

Strict compliance with safety work permits, warning barriers, and full PPE equipment throughout the assembly process.

Mechanical Precision

Installation and alignment accurate to the millimeter, ensuring modules fit perfectly and the line operates smoothly without vibration or leakage.

Standard

Commitment to protecting stainless steel surfaces from scratches, meeting strict GMP hygiene standards for the food industry.

Schedule Discipline

Mobilizing maximum skilled labor and organizing continuous work to complete a massive workload in the shortest time possible.

Speed

Optimizing plant downtime and bringing the new production system into operation by the committed deadline.

 

Do you need consultancy for relocating or installing heavy industrial machinery?

  • Installation and connection of synchronized production lines
  • Relocation and positioning of oversized and overweight equipment
  • Fabrication and erection of steel structures and stainless steel tanks

Contact PV Vina now for a detailed discussion

PV Vina is proud to have a team of highly experienced mechanical engineers, specializing in providing safe construction and installation solutions for complex industrial line systems.