Nestlé Plant Boiler Maintenance & Renovation

 

Client

Nestlé Vietnam Ltd.

 

Scope of Work

Refractory material application, boiler tube wall maintenance, and scaffolding erection in confined spaces.

 

Timeline

2024

Actual Construction Images

Boiler refractory material application
Workers operating inside the boiler Scaffolding erection inside the boiler
Inside the boiler space

Execution Process

Survey
Phase 01

Survey & Risk Assessment

Conducting an on-site survey inside the boiler (confined space). Assessing the wear and tear of the refractory concrete layer and water tube walls, and developing a construction plan to ensure absolute safety according to Nestlé's standards.

Preparation
Phase 02

Preparation & Scaffolding Erection

 Gathering specialized materials, equipment, and obtaining work permits.

 Erecting a safe and sturdy scaffolding system inside the combustion chamber.

 Arranging standard ventilation and lighting systems for the enclosed space.

Execution
Phase 03

Execution & Handover

PV-VINA's team of skilled technicians applies refractory materials and repairs tube walls. Quality is closely monitored at every stage, followed by site clearing and final acceptance handover to bring the boiler back into operation on schedule.

PV-VINA's Commitments

Safety Standards

Strict compliance with international occupational safety standards (HSE), particularly regulations for working in Confined Spaces.

HSE

"Safety First" is always the guiding principle in all of PV-VINA's construction activities at our clients' facilities.

Superior Quality

Utilizing genuine heat-resistant materials combined with deep technical expertise to enhance boiler lifespan and performance.

100%

Ensuring the boiler system operates stably and tightly, optimizing the heat generation process and saving fuel for the plant.

Committed Progress

Optimizing continuous workflows, shortening boiler downtime, and helping the factory quickly resume production activities.

Support

Our team of engineers and workers are always ready to work overtime to meet urgent delivery schedules without compromising on quality.

 

Need consultancy on heating and steam piping solutions?

  • Steam system upgrade consultancy
  • New system design consultancy for plants
  • Safety survey & assessment

Contact PV Vina now for a detailed discussion

PV Vina partners with businesses in designing and operating safe, sustainable, and cost-effective heating and steam piping systems.